PR 18-04
ELECTRONIC PLAN REVIEW FOR DESIGN PROFESSIONALS
PR 18-04 (Revised 02/08/23) Page 14 of 35
DIVISION OF THE STATE ARCHITECTDEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA
4.3.1.1 Change the status of any markup in the BSS.
4.3.1.2 Add or edit replies to any markup in the BSS.
4.3.1.3 Add or edit markups in the BSS.
4.3.2 After DSA completes a round of back check and notifies the design team that the project
is not approved, the design professional shall join the BSS and review the status of plan review
comments. The design professional(s) shall respond to the plan review markups according to
their status as follows:
4.3.2.1 Gray markups with status set to “CLOSE” are resolved and require no further action.
4.3.2.2 Purple markups with status set to “ADDITIONAL REVIEW REQUIRED” will be
discussed further with the plan reviewer. The design professional should not change the status
of these markups but should be prepared to discuss their content.
4.3.2.3 Red markups with status set to “OPEN” require further response from the design
professional. The design professional shall respond to these comments in accordance with the
requirements of Section 3.2 and 3.3 above.
4.3.2.4 The V2 documents may contain red markups pertaining to new or revised content
and/or where the response to an original comment was incorrect or incomplete. The design
professional shall respond to all red comments in the V2 documents in accordance with the
requirements of Section 3.2 and 3.3 above.
4.3.3 After DSA completes a round of back check and notifies the design team that the project
is not approved, further corrections to the approval documents are commonly required. These
document modifications can be accomplished in one of two general methods described below.
4.3.3.1 The design professional(s) may make changes within the BSS environment. When
making changes to documents in BSS, the design professional shall not lock the corrective
markups. Refer to Section B3 below for additional information concerning editing documents in
the BSS.
4.3.3.2 The design professional(s) may make changes outside of the BSS environment (e.g.,
REVIT, AUTOCAD, etc.). In this case, the design professional shall upload a new version of the
document to the BSP in accordance with Section 4.1.2 above. Certain document changes (e.g.,
adding a page, removing a page, etc.) cannot be accomplished within the BSS environment and
consequently require this method.
4.3.4 Any questions and/or points of disagreement with the remaining plan review comments
must be resolved with the plan reviewer prior to the next round of back check. The design
professional shall contact the DSA plan reviewer who authored the comment that is subject to
question or disagreement prior to the next round of back check to obtain agreement and
resolution. The contact information for each plan reviewer can be found on the “PR Tracking
Table” document in the BSS.
4.4 Back Check in DSA Regional Office
When a back check meeting is scheduled to occur in the DSA regional office, the design
professional shall perform the following actions:
4.4.1 Check in at the front desk and obtain the assigned back check station number.
4.4.2 Proceed to the assigned back check station. DSA provides access to a computer,
monitor, and printer. Through this computer the design professional is provided access to
Bluebeam Revu, Bluebeam Studio, DSAbox, and the internet.
4.4.3 Login to the DSA back check station computer as a guest user. The username and